It rained. A lot.

The Gill Beck going the full Zambesi at Tong Park after storm Ciara: Sunday 9th Feb
Water almost up to the bottom of the bridge at the dam
And briefly flowing over the old weir again
A raging torrent heads for the viaduct

All this action has substantially re-engineered the Gill Beck.

We now have a long stretch of steep sandy bank
And new water features: all the fine silt has been stripped out of the river bed leaving clean shingle. Looks good for trout spawning.
A beach! Already with sprouting Butterbur
The old stream bed has dried out again but the damp conditions are ideal for Opposite-leaved Golden Saxifrage -one of the signature plants of the valley.
The new design seems to suit the resident Dippers (Photo Paul Marfell)

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s